Portfolio Details
Packing Bay Roof Refurbishment – South Wales
A 3 layer felt roof system had become worn & started to leak, saturating the concrete roof underneath. The major hurdle we had to overcome was the roof had originally been designed to hold water surrounded with a parapet wall and only one outlet. We stripped the roof back to the concrete and dried it out, a cut to falls insulation scheme was designed to clear the water from the roof and bring it up to level with an adjoin roof. New outlets were built through the parapet wall to allow sufficient drainage. A 25year cold liquid applied polyurethane warm roof system was installed using the designed insulation scheme. This allowed the glazing that now formed part of the flashing upstand to be easily waterproofed.
See some of our other work:
You may also like
Roof Refurbishment of Offices and Canteen – Warwickshire
Roof Refurbishment of Offices and Canteen – Warwickshire A poorly installed previous coating had peeled off, exposing the old degraded felt roof system, allowing water ingress into the canteen below. A tight budget allowed only the worst affected section to be waterproofed within this stage. A 15 year 3M Skotchkote cold applied liquid polyurethane overcoat […]
View Details
Field Study Centre – North Norfolk
Field Study Centre – North Norfolk Proctor Roofing were successful in tendering for the re- roofing project on this building. All the old tiles were removed and carefully set aside with all old felt/batten being removed and replaced with new, all original sound tiles were re-laid and to follow the existing pattern & New Dreadnought […]
View Details
Plant Room Roof Refurbishment – Leicestershire
Plant Room Roof Refurbishment – Leicestershire A worn felt roof system had been leaking for some time and the bond between the roofing system and the metal deck substrate had broken down, causing the roof to become very bouncy and unstable. Stripping the roof was not an option due to the time of year and […]
View Details