Packing Bay Roof Refurbishment – South Wales
A 3 layer felt roof system had become worn & started to leak, saturating the concrete roof underneath. The major hurdle we had to overcome was the roof had originally been designed to hold water surrounded with a parapet wall and only one outlet. We stripped the roof back to the concrete and dried it out, a cut to falls insulation scheme was designed to clear the water from the roof and bring it up to level with an adjoin roof. New outlets were built through the parapet wall to allow sufficient drainage. A 25year cold liquid applied polyurethane warm roof system was installed using the designed insulation scheme. This allowed the glazing that now formed part of the flashing upstand to be easily waterproofed.
See some of our other work:
You may also like
Field Study Centre – North Norfolk
Field Study Centre – North Norfolk Proctor Roofing were successful in tendering for the re- roofing project on this building. All the old tiles were removed and carefully set aside with all old felt/batten being removed and replaced with new, all original sound tiles were re-laid and to follow the existing pattern & New Dreadnought […]
View Details
Gaywood Primary School – Kings Lynn
Gaywood Primary School – Kings Lynn The existing degraded felt roof had been patched several times and had past the end of its serviceable life. Proctor Roofing were successful in tendering for the re-roofing project and a full BUR single layer hot air welded felt membrane roof was installed including removal of redundant roof lights […]
View Details
EPDM Roofing – Roof Replacement of Storage Barn – Kings Lynn
EPDM Roofing – Roof Replacement of Storage Barn – Kings Lynn A nailed down old felt roof had blown off a storage barn during high winds leaving the original close boarded wooden framed roof exposed to the elements. The aged timber roof boards were showing signs of rot and an alternative roofing system that could […]
View Details