Packing Bay Roof Refurbishment – South Wales
A 3 layer felt roof system had become worn & started to leak, saturating the concrete roof underneath. The major hurdle we had to overcome was the roof had originally been designed to hold water surrounded with a parapet wall and only one outlet. We stripped the roof back to the concrete and dried it out, a cut to falls insulation scheme was designed to clear the water from the roof and bring it up to level with an adjoin roof. New outlets were built through the parapet wall to allow sufficient drainage. A 25year cold liquid applied polyurethane warm roof system was installed using the designed insulation scheme. This allowed the glazing that now formed part of the flashing upstand to be easily waterproofed.
See some of our other work:
You may also like
King Edward VII Academy Flooring – King’s Lynn
King Edward VII Academy Flooring – King’s Lynn The existing flooring had started to split and delaminate, it was also no longer watertight. Raised seams were causing a trip hazard. Proctor Roofing were contracted to complete the work within the Easter holidays. Westwood Wecryl and Weproof liquid PMMA products were used to form a seamless […]
View Details
Conservative Club – Sutton Bridge
Conservative Club – Sutton Bridge The client had decided to be pro-active with the maintenance of this roof which meant the good quality existing substrate allowed the use of Europolymers Evolution Overlay System to be laid by Proctor Roofing without any disruption to daily routine. See some of our other work:
View Details
Gaywood Primary School – Kings Lynn
Gaywood Primary School – Kings Lynn The existing degraded felt roof had been patched several times and had past the end of its serviceable life. Proctor Roofing were successful in tendering for the re-roofing project and a full BUR single layer hot air welded felt membrane roof was installed including removal of redundant roof lights […]
View Details