Packing Bay Roof Refurbishment – South Wales
A 3 layer felt roof system had become worn & started to leak, saturating the concrete roof underneath. The major hurdle we had to overcome was the roof had originally been designed to hold water surrounded with a parapet wall and only one outlet. We stripped the roof back to the concrete and dried it out, a cut to falls insulation scheme was designed to clear the water from the roof and bring it up to level with an adjoin roof. New outlets were built through the parapet wall to allow sufficient drainage. A 25year cold liquid applied polyurethane warm roof system was installed using the designed insulation scheme. This allowed the glazing that now formed part of the flashing upstand to be easily waterproofed.
See some of our other work:
You may also like
EPDM Roofing – Roof Replacement of Storage Barn – Kings Lynn
EPDM Roofing – Roof Replacement of Storage Barn – Kings Lynn A nailed down old felt roof had blown off a storage barn during high winds leaving the original close boarded wooden framed roof exposed to the elements. The aged timber roof boards were showing signs of rot and an alternative roofing system that could […]
View Details
Sea Life Centre – Hunstanton
Sea Life Centre – Hunstanton Severe tidal floods had destroyed most of the original building and the main contractor was charged with rebuilding to match the original build. Proctor Roofing were contacted to specify and install a cost effective system that could be used in both the refurbishment and new build scenarios. Because of its […]
View Details
King Edward VII Academy Flooring – King’s Lynn
King Edward VII Academy Flooring – King’s Lynn The existing flooring had started to split and delaminate, it was also no longer watertight. Raised seams were causing a trip hazard. Proctor Roofing were contracted to complete the work within the Easter holidays. Westwood Wecryl and Weproof liquid PMMA products were used to form a seamless […]